The access road will link the central expressway with road networks in Western, Wayamba and Central Provinces.
For Section I of the Central Expressway 12 access roads of 117.68 kilometres were planned.
For Section II, 14 access roads of 83.98 kilometres were planned.
For Section IV, 9 access roads of 81.36 million were planned.
The roads are to be build in the 2026-2030 period. (Colombo/Aug29/2026)